
1

2

3

4

5

6

Excavation work

Laying roadbase and tidying edges

Rolling for a solid surface

Finished bitumen road

Finished bitumen road

Finished bitumen road

Before the construction of the concrete block wall.

Preparation for placement of concrete blocks

Placement of concrete blocks (2.5 tonne)

Wall taking shape

Placement of capping blocks

Completed block wall, ready for landscaping

Gabion Rock retaining wall - Midway

Gabion Rock retaining wall - Completed

Gabion Rock retaining wall - Completed

This site started as a small muddy hole, and we have now turned it into a retention dam and swimming hole.

Before our construction of a road with a water retention area.

Midway through the construction of a road with a water retention area.

After our construction of a road with a water retention area.

New pad cut to create workspace

Start of driveway

Driveway completed using heavy bound road base

Digging out a new dam

Completed dam

Halfway through repairing an old access road

New V-drain with rocks

New driveway using heavy bound roadbase

Halfway through construction of new pad area with water mitigation

Installation of pits and pipes between macadamia nut trees

New road using 20mm unspec roadbase

New pad area

Moving rocks with 5 Tonne grab

Site clean after installation of in ground pool

Some of our machines

Creating a new pad area

Placing topsoil on a newly created bank

New road & large pad for sheds

We specialise in concrete pipe drains

Installing concrete pipes to create an access road

Clearing forest

Slashing paddocks
Copyright © 2024 What On Earth - All Rights Reserved.
ABN: 33 443 170 700